June
- new main entrance structure in position
Inside in the background - the 4000m²+ first floor
mezzanine covering the whole buildingis nearly covered up with fire protection
and ceilings.
85 heavy duty legs on piles supports the mezzanine on
a 7.5m x 8m grid